Panel space for the equipment you’re adding next.
Hub City Electric upgrades commercial panels, subpanels, and distribution around Albany, so a full panel or a maxed-out feeder never stalls your expansion. Licensed CCB#247871. Call (541) 220-0295 for a free quote.
When the Panel Runs Out of Room
Commercial panel upgrades are about the distribution side of your building, not the utility service coming in. Your incoming service might have plenty of headroom while the panel that actually feeds your equipment is full, undersized, or wired single-phase when the new machine on the floor needs three-phase. Adding a compressor, a new oven line, more workstations, or a bank of EV chargers means those loads have to land somewhere, and a maxed-out panel with no open slots leaves you stuck. Upgrading the panel and distribution gives your loads a home without touching the meter or waiting weeks on the power company.
We upgrade commercial panels and subpanels for shops, restaurants, offices, and light-industrial spaces across the Albany area. The calls usually come from an owner or a tenant improvement contractor who has been told the existing panel is at capacity, or from a business standing up equipment the building was never wired for. Sometimes the right move is a larger main panel, sometimes it is a dedicated subpanel for one wing or one machine, and sometimes it is converting distribution to three-phase for the equipment that requires it. We figure out which one solves your problem and size it for the loads you are actually adding.
Because this is distribution work rather than a service-entrance job, it is often faster and less disruptive than a full service upgrade. If your incoming service already has capacity, we can add slots and feeders without the utility scheduling that drags out bigger projects. When the service itself is the bottleneck, we will tell you that honestly and point you to the right scope instead of selling you a panel that will not fix the real ceiling.
Larger Main Distribution Panel
Swap an undersized or full main panel for one with the amperage and slots your loads need.
Subpanels for New Equipment
Add a dedicated subpanel for a wing, a tenant space, or a single heavy machine.
Single to Three-Phase Distribution
Set up three-phase panels and feeders for equipment that will not run on single-phase.
Tenant Improvement Panels
Panel and feeder work sized to a build-out so your TI contractor stays on schedule.
Feeder & Breaker Upgrades
Upsize feeders and breakers so added equipment runs without nuisance trips.
The Commercial Panel Upgrade Process
Walk the equipment and loads
We look at what you are adding, check what the existing service and panel can carry, and confirm whether the fix is a bigger panel, a subpanel, or three-phase.
Design and permit the distribution
We size the panel, feeders, and breakers, pull the electrical permit, and plan the work around your operating hours.
Install and land the circuits
We set the new panel or subpanel, run the feeders, and land every circuit clean and labeled so the next electrician can read it.
Inspect and energize
We meet the inspector, energize the new distribution, and confirm your equipment has the power it needs before we leave.
What to Know Before You Upgrade
The first question is always whether your problem lives at the panel or at the service entrance, because it changes the whole scope. If your incoming service has capacity and the panel is simply full or too small, a panel or subpanel upgrade is faster and cheaper and often skips the utility entirely. If the building itself has outgrown its incoming service, adding a bigger panel behind an undersized service just moves the bottleneck. We run the numbers and tell you which one you are dealing with before you spend anything.
Three-phase is the other thing worth checking early. A lot of commercial equipment, compressors, larger HVAC, and shop machinery among it, requires three-phase power, and if your building only has single-phase distribution, that has to be addressed as part of the upgrade. Every commercial panel upgrade in Oregon is permitted and inspected, no exceptions, and we schedule the power-off window around nights or weekends wherever we can to keep your operation running. Cost tracks the panel size, the feeder and breaker work, and whether three-phase is involved. We give you the honest number up front.
Licensed Oregon electrician (CCB#247871) covering Albany and a 70-mile radius across the Willamette Valley. Call (541) 220-0295 for a free quote with a clear price up front.
We schedule power-off windows around your hours to protect uptime.
Why Albany Businesses Call Us for This Work
Panel or service, we tell you straight
We diagnose whether the fix is distribution or the incoming service, so you pay for the scope that actually solves it.
Three-phase when the equipment needs it
New machinery that will not run single-phase gets the three-phase distribution it requires, planned in from the start.
Scheduled around your uptime
We take the power-off window nights or weekends wherever we can, so the upgrade does not cost you a business day.
Labeled and inspection-ready
Every circuit is landed clean and labeled, permitted and inspected, so it reads right for the next tech and passes on the first visit.
Licensed Electrician for Albany, OR
Hub City Electric LLC is licensed in Oregon (CCB#247871) and carries full insurance. Brandon founded the company in 2023 and brings 11 years of electrical experience. Every job is handled by our own crew. No subcontractors, no shortcuts. Not sure whether you need panel work or a full service upgrade? We will tell you which one your building actually needs.
Common Questions
What is the difference between a panel upgrade and a service upgrade?
A panel upgrade works on the distribution side, the panel, subpanels, feeders, and breakers that feed your equipment. A service upgrade increases the incoming power from the utility. If your service has capacity but the panel is full or undersized, you want a panel upgrade, which is usually faster and skips the utility scheduling.
Can you add a subpanel instead of replacing the main?
Often, yes. If your main service has headroom, a dedicated subpanel for a new machine, a wing, or a tenant space is frequently the cleaner and cheaper fix than swapping the whole main panel. We assess which approach solves your load problem.
Do you handle single to three-phase conversions?
Yes. A lot of commercial equipment requires three-phase power. We set up three-phase panels and feeders as part of the upgrade so machinery that will not run single-phase has what it needs.
Can you do the work without shutting down my business?
We plan the power-off window around your operating hours and take it nights or weekends wherever the job allows, so the upgrade costs you as little uptime as possible.
Is a permit required for a commercial panel upgrade?
Yes, always. Every commercial panel upgrade in Oregon is permitted and inspected. We pull the permit and get the work inspected so it is documented and passes clean.
How do I get a quote?
Call (541) 220-0295 or send us a message through the contact page. We will walk the equipment and loads, tell you whether it is a panel or service job, and give you a clear price up front.
Panel full and holding up your expansion?
Call or message us for a free quote. We pick up fast and give you a straight answer on the panel work your building needs.